Install Beeyard Sensor on your beehive

Step 1

Attach the unit to the bottom of your beehive.
Use the dummy bar to balance the beehive.

Step 2

Fix them with screws

Step 3

Insert the temperature and humidity probes through the lower hatch entrance to the top opening on a vertical edge. The temperature probe should be placed in the brood frames inside the hive and the humidity probe should be positioned on the top of the frames.

Step 4

Place the solar panel on the top or lateral of your beehive.
Solar panel should be positioned to receive as much sun light as possible.